Planningvia East Riding of Yorkshire Council Planning
Proposed phased replacement of the existing concrete footbridge, comprising: Phase 1: Demolition of the existing conc...
Proposed phased replacement of the existing concrete footbridge, comprising: Phase 1: Demolition of the existing concrete footbridge. Phase 2: Erection of a new steel footbridge with stepped access on
Proposed phased replacement of the existing concrete footbridge, comprising: Phase 1: Demolition of the existing concrete footbridge. Phase 2: Erection of a new steel footbridge with stepped access only. Phase 3: Installation of accessible ramps to serve the new footbridge.
Address: Footbridge Over Railway At Priory Drive Kingston Upon Hull
Ref: 26/00890/FULL
Type: Full Planning Permission
Status: Pending Consideration
Ward: Derringham
Consultation ends: 2026-10-22

Comments
No comments yet. Be the first to share your thoughts!